TM5-3810-305-10
4.
5.
6.
d.
Stow pads in hanger brackets on right side
of boom toward tip. Secure with rod (25)
and two cotter pins (26, Figure 5-33) lo-
cated on boom.
Clean and stow all remaining items and tools,
used for sectionalization disassembly, in tool
box.
Check fuel tank. Add diesel fuel to bring level
up to the 3/4 full mark.
NOTE
Prior to air lifting carrier, rear
axle must be in locked position.
Start engine. Rotate swing bearing 10 or
more degrees from unlocked position (refer to
step 1 b). Cam roller on valve must be out of
notch on rotary manifold. Shut engine off.
The vehicle is now sectionalized.
Preparation for and Assembly of
Sectionalized LRT 110 Type II Crane After
External Air Tranport (EAT)
Preparation for Assembly
Carrier is to be positioned parallel to upperstruc-
ture on operators right side, with boom tip to
rear and counterweight to front. Front outrigger
beam is to be positioned approximately even
with upper hose clamp (Figure 5-34).
1. Install pads on outrigger beams.
a.
b.
Remove two cotter pins (26) and rod (25)
that stow pads on right side of boom
(Figure 5-33). Remove pads for installa-
tion and reinstall rod (25) and pins (26) on
side of boom.
Remove nuts, washers and bolts from ends
of outrigger beams and install pads.
Reinstall bolts, washers and nuts to ends
of outrigger beams. Torque nuts to 240 lb-
ft (325 N l m).
Figure 5-33 Secure Pads on Boom
5-26