TM5-3810-305-104.5.6.d.Stow pads in hanger brackets on right sideof boom toward tip. Secure with rod (25)and two cotter pins (26, Figure 5-33) lo-cated on boom.Clean and stow all remaining items and tools,used for sectionalization disassembly, in toolbox.Check fuel tank. Add diesel fuel to bring levelup to the 3/4 full mark.NOTEPrior to air lifting carrier, rearaxle must be in locked position.Start engine. Rotate swing bearing 10 ormore degrees from unlocked position (refer tostep 1 b). Cam roller on valve must be out ofnotch on rotary manifold. Shut engine off.The vehicle is now “sectionalized.”Preparation for and Assembly ofSectionalized LRT 110 Type II Crane AfterExternalAirTranport(EAT)Preparation for AssemblyCarrier is to be positioned parallel to upperstruc-ture on operator’s right side, with boom tip torear and counterweight to front. Front outriggerbeam is to be positioned approximately evenwith upper hose clamp (Figure 5-34).1. Install pads on outrigger beams.a.b.Remove two cotter pins (26) and rod (25)that stow pads on right side of boom(Figure 5-33). Remove pads for installa-tion and reinstall rod (25) and pins (26) onside of boom.Remove nuts, washers and bolts from endsof outrigger beams and install pads.Reinstall bolts, washers and nuts to endsof outrigger beams. Torque nuts to 240 lb-ft (325 N l m).Figure 5-33 SecurePadsonBoom5-26
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business