TM 5-3810-306-20
2.
INSTALL FITTINGS (2).
3.
CONNECT TWO AIR LINES (1).
a.
Connect tagged air lines (1) to gauge (3) as
marked.
b.
Tighten fittings.
4.
INSTALL BULB (6).
a.
Put bulb (6) in socket (5). Slide filter cap (4)
over bulb (6).
b.
Install socket (5) in back of gauge (3).
5.
INSTALL
LEFT
FRONT
CONTROL
PANEL.
(REFER TO PAGE 8-11.)
6.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
7.
START ENGINE (REFER TO TM 5-3810306-10.)
8.
MAKE SURE ARROWS ON GAUGE (3) RISE
UNTIL A PRESSURE READING OF 110 PSI IS
REACHED.
END OF TASK
8-9