TM 5-3810-306-20
c.
Coat threads of fittings and lines (2) with loctite
545. Install tagged lines on valve using new
preformed packings.
d.
Connect tagged electrical connectors (6) to
valve.
2.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
3.
START ENGINE AND CHECK OUTRIGGER
OPERATION. (REFER TO TM 5-3810-306-10.)
END OF TASK
16-5