TM 5-3810-306-20
FRONT AND REAR OUTRIGGER CONTROL VALVE INSTALLATION
TOOLS: General mechanics tool kit: automotive (5180-00-177-7033)
Lubrication Service, Unit Trailer Mounted (4930-00-017-9167)
Shop Equipment Auto-Maintenance and Repair, FM Basic (4910-00-754-0705)
Shop Equipment Auto-Maintenance and Repair, FM Suppl No. 1 (4910-00-754-0706)
Tool Outfit Hyd System; Test and Repair, 3/4 Ton Trailer Mtd
(4940-01-036-5784)
SUPPLIES:
Hydraulic oil (Item 6, Appendix C)
Loctite 545 (Item 13, Appendix C)
Preformed packing (Item 3, Appendix C) (4 Required)
Preformed packing (Item 58, Appendix C)
Lockwashers (Item 50, Appendix C)
EQUIPMENT CONDITION:
Disconnect ground cable at shunt. (Refer to page 8-109.)
REMOVAL:
1.
REMOVE
OUTRIGGER
CONTROL
VALVE
ASSEMBLY (6).
a.
Tag and disconnect five hydraulic lines (4) to
outrigger control valve bank.
b.
Tag and disconnect electrical connectors (5) to
outrigger control valve bank.
c.
Remove four nuts (1) and lockwashers (2)
securing valve bank to frame studs (3). Discard
lockwashers (2).
d.
Remove outrigger control valve bank (6).
e.
Remove fittings and preformed packings. Save
fittings for installation as necessary. Discard
preformed packings.
INSTALLATION:
1.
INSTALL OUTRIGGER CONTROL VALVE.
a.
Install fittings and new preformed packings.
16-6