TM 5-3810-306-20
b.
Position outrigger control valve (6) on frame
studs (3) and secure with new lockwashers (2)
and nuts (1).
NOTE
Coat threads on all lines with Loctite 545
prior to installation.
c.
Remove tags and install five hydraulic lines (4),
with new preformed packings, to outrigger
control valve.
d.
Remove tags and connect electrical connectors
(5).
2.
CONNECT GROUND CABLE AT SHUNT. (REFER
TO PAGE 8-109.)
3.
START ENGINE AND CHECK OUTRIGGER
OPERATION. (REFER TO TM 5-3810-30610.)
END OF TASK
16-7