CHAPTER 1 INTRODUCTION - TM-5-3810-289-340033CHAPTER 2 DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONSTable 2-1. Special tools and equipmentSection III. GENERAL MAINTENANCE INSTRUCTIONSMaintenance of Gears and BearingsTable 2-2. Reference DataTable 2-2. Reference Data-Continued - TM-5-3810-289-340039Table 2-2. Reference Data-Continued - TM-5-3810-289-340040Table 2-2. Reference Data-Continued - TM-5-3810-289-340041Table 2-2. Reference Data-Continued - TM-5-3810-289-340042Table 2-2. Reference Data-Continued - TM-5-3810-289-340043Table 2-2. Reference Data-Continued - TM-5-3810-289-340044Table 2-2. Reference Data-Continued - TM-5-3810-289-340045Table 2-2. Reference Data-Continued - TM-5-3810-289-340046Table 2-2. Reference Data-Continued - TM-5-3810-289-340047Table 2-2. Reference Data-Continued - TM-5-3810-289-340048Table 2-2. Reference Data-Continued - TM-5-3810-289-340049Table 2-2. Reference Data-Continued - TM-5-3810-289-340050Table 2-2. Reference Data-Continued - TM-5-3810-289-340051Table 2-2. Reference Data-Continued - TM-5-3810-289-340052Table 2-2. Reference Data-Continued - TM-5-3810-289-340053Table 2-2. Reference Data-Continued - TM-5-3810-289-340054Section IV. REMOVAL AND INSTALLATION OF MAJOR COMPONENTS - TM-5-3810-289-340055Figure 2-2. Engine assembly removal and installation.CHAPTER 3 REPAIR OF ENGINE AND ACCESSORIESFigure 3-1. Alternator assembly, exploded view.Figure 3-2. Alternator test connections.Figure 3-4. Fuel pump return line removalFigure 3-6. Fuel pump removalFigure 3-9. Pulsation damper removal and installation.Figure 3-8. Shut down valve removalFigure 3-12. Governor plunger removalFigure 3-16. Spring pack assembly removal.Figure 3-21. Washer being installed over plunger.Figure 3-24. Spring pack snap ring installation.Figure 3-30. Governor plunger, installation.Figure 3-32. Nylon buffer installation.Figure 3-35. "Plate type" valve inspectionFigure 3-38. Valve assemblyFigure 3-40. Drive shaft bushing reamingFigure 3-44. Snap ring removal from grooveFigure 3-46. Gear removal from weight carrier.Figure 3-50. Drive cover oil seal installation.Figure 3-56. Governor plunger driver removal.Figure 3-57. Clearance check between washer and driver.Figure 3-61. Locating notches.Figure 3-65. Fuel filter scree - MVS governor type.Figure 3-66. Governor plunger being lapped to burrel.Figure 3-70. Current PT (type G) governor plungerFigure 3-72. Tachometer gear begin pressedFigure 3-74. Injector removalFigure 3-78. Corroded injector cup tipFigure 3-83. Pulling link with a tap holderFigure 3-89. Size markings on injector bodyFigure 3-96. Sleeve seat bead and chamfer location.Figure 3-96. Sleeve seat bead and chamfer locationFigure 3-99. Sealing lower end of injector sleeveFigure 3-101. Clutch assembly, cutaway view.Figure 3-103. Primer unit: lines, fittings, exploded view.Section II. ENGINE COMPONENTSFigure 3-107. Bearing and shaft assembly being pressed in.Figure 3-108. Mandrel being placed on seal driving lip.Figure 3-110. Fan hub assembly removal and installation.Figure 3-111. Fan hub assembly, exploded viewFigure 3-112. Accessory drive pulley removalFigure 3-114. Accessory drive assembly, exploded view.Figure 3-115. Accessory drive pulley installation.Figure 3-118. Cylinder head removalFigure 3-121. Install injector sleeve holding tool ST-383.Figure 3-125. Setting reamer depthFigure 3-129. Regroove cylinder head.Figure 3-130. Installing grommets and retainersFigure 3-134. Loosening rocker arm lever jam nuts.Figure 3-138. Magnetic inspection crack indication.Figure 3-141. Rocker arm assembly, exploded view.Figure 3-142. Rocker arm assembly.Figure 3-145. Torquing cylinder head capscrews.Figure 3-150. Minimum valve head rim thickness.Figure 3-152. Valve guide measurement.Figure 3-155. Pencil marks on valves.Figure 3-158. Tappet guide screw removal and installation.Figure 3-162. Tappet installation.Figure 3-164. Flywheel indicator gage installation.Figure 3-167. Camshaft counterbore gasket installation.Figure 3-170. Oil pan, exploded view.Figure 3-171. Oil pan installation.Figure 3-175. Oil pump and suction tube installation.Figure 3-179. Crankshaft hub installationFigure 3-182. Gear cover removal and installationFigure 3-184. Gear cover mounting plate removalFigure 3-187. Camshaft removalFigure 3-191. Checking camshaft gear backlashoFigure 3-192. Checking camshaft end playFigure 3-198. Connecting rod cap removalFigure 3-201. Connecting rod crank journal bore checkFigure 3-202. Connecting rod piston pin bushing checkFigure 3-206. Piston check pointsFigure 3-208. Piston pin bushing installationFigure 3-210. Installing pin in piston and rodFigure 3-212. Piston and rod assemblies installationFigure 3-216. Prying main bearing caps looseFigure 3-219. Drilling dowel hole in rear main bearingFigure 3-224. Cleaning drilled oil passages.Figure 3-226. Crankshaft dimension pointsFigure 3-228. Upper main bearing shells installation.Figure 3-230. Main bearing cap with thrust ring in place.Figure 3-232. Checking crankshaft end play.Figure 3-235. Air bleed hole.Figure 3-238. Cylinder liner counterbore dimensions.Figure 3-241. Inspecting cylinder liner clearance.Figure 3-245. Tappet bore inside diameter checkFigure 3-247. Camshaft bushing installationFigure 3-251. Standard and oversize counterbore diameters.Figure 3-255. Valve seat insert cross-section.Figure 3-257. Refacing valve seat.Figure 3-259. Valve crossheads removal.Figure 3-264. Pulling cylinder liner with ST-777 puller.Figure 3-266. Cylinder liner bore inspection.Figure 3-268. Honing Liner.Figure 3-269. Initial honing stone expansion.Figure 3-270. Cylinder liner counterbore inspection.Figure 3-271. Cylinder liner flange inspection.CHAPTER 4 REPAIR OF CRANE-SHOVEL UPPER WORKS AND LOWER WORKSFigure 4-1. Transmission shaft, exploded view.Figure 4-3. Gear case sumpFIGURE 4-4. VERTICAL SWING SHAFTPrepare Upper Works for Installation.Figure 4-6. Vertical propel shaft, exploded view (sheet 1 of 3).Figure 4-6. Vertical propel shaft, exploded view (sheet 2 of 3).Figure 4-6. Vertical propel shaft, exploded view (sheet 3 of 3)Figure 4-7. Vertical swing shaft repair and replacement.Figure 4-8. Horizontal swing shift, cutaway view.Figure 4-10. Re drum shift shifter bridge and yokeRear Drum Shaft AssemblyFigure 4-11. Rear and front drum shaft assembly exploded view (sheet 1 of 3).Figure 4-11. Rear end front drum shaft assembly exploded view (sheet 2 of 3)Figure 4-11. Rear and front drum shaft assembly, exploded view (sheet 3 of 3).Figure 4-12. Rear drum shaft assembly (left side).Figure 4-13. Rear drum shaft assembly (right side).Figure 4-15. Front drum shaft removalFigure 4-16. Boom hoist clutch and brake band removal and installations.Figure 4-17. Front drum shaft assembly (right side)Figure 4-18. Boom hoist safety pawl.Figure 4-19. Control levers - TM-5-3810-289-340176Figure 4-20. Independent boom hoist assembly, exploded view.Main ClutchesSection II. LOWER WORKSCenter Propelling Shaft - TM-5-3810-289-340180Center Gudgeon BushingFigure 4-21. Track drive sprocket replacementAPPENDIX A REFERENCES - TM-5-3810-289-340183TM-5-3810-289-34 Crane-Shovel Crawler Mounted; 12 Ton - Cu Yd; Diesel Engine Driven Manual